Geotech Blog |

Project Stories | Construction of the two level road interchange near the metro tunnel

Written by MIDAS GEO TEAM | 2020.04.14

About Project

The construction is complicated by the fact that 20m deep tunnels performed open way in water saturated sands and tested at an average distance of 10m from residential buildings. In this excavation, Halabyan - Baltic tunnel under two tunnels under the existing subway and the Leningrad highway tunnel runs closed method without stopping subway and vehicle traffic.

 

Site location of SOKOL district

 

Project Name

Leningradskoye Highway

Location

Moscow, Russia

Construction Period

2007 – 2015

Contractor

NPO Cosmos

Designer

Podzemproekt LLC

 

Mesh for underground structures

 

3D mesh for construction stage analysis

 

 

 

 

👉 Relevant project 

▪️ Blog | 5 Common tunnel designs to consider 3D effects

▪️ Blog | Modelling of the joints between segments in TBM Tunnel

👉 Click here to see the case study webinar