• GeoXD
  • GTS NX
    Overview Geometry Modeler Mesh Generator Solver System Post-Processing
  • Events
  • Resources
    Blog MIDAS Expert Network Technical Support
  • Get Started
    GeoXD GTS NX
  • Talk to us
midas GTS NX Case Study Webinar Series Case Study of SG Metro Consulting
3D Excavation Work for Detention Tank
May 27, 2020 (Wed) 10:00 ~ 11:00 (SGT/MYT) | Webinar Duration : 60 Min
Done
OVERVIEW

MIDAS Geo launches the new series of training for the geotechnical engineers. We are going to provide e-learning opportunity based on the real projects shared by MIDAS users. This training will help you enhance your design process by using the practical software tool developed by the practical engineers. 

PROJECT INFO

3D Excavation Work for Detention Tank

This case study webinar is conducted based on the real project done by Singapore Metro Consulting in Singapore. 9 reference boreholes are considered for ground condition in this case. In addition, ERSS contains sheet pile wall, strut and waler. There are 3 stages for excavation around 5.7m of depth. The water level is considered from each excavation stage on the floor of excavation.

USER INFO

Singapore Metro Consulting

is a dedicated team of professional engineers and project managers working with government agencies, private clients, communities and colleagues to develop and implement innovative and win-win solutions to today’s complex projects for the betterment of people’s life.

 

 - Address: 21 Woodlands Close #02-17 PRIMZ BIZHUB, Singapore 737854

 - Phone: +65 6635 8234

Read all
The event is done.
Thank you for your interest.
You are registered.

Thanks for registration.
The registration confirmation email has been sent to your email

You are registered.

Thanks for registration.
Please check the confirmation email from GoToWebinar for joining the session.

CONTENTS
01 Bedding Plane

Using bedding plane function with 9 number of reference boreholes to assume the realistic ground condition.

 

02 ERSS Modeling

Earth Retaining Stabilizing System for excavation work contains sheet pile, strut and waler. 

 

03 Water Level

Considering water level, it is aligned with floor of excavation from each excavation stages.

 

04 Result Checking

Checking the results of total / horizontal / vertical displacement and forces inside retaining wall and strut.

 

WEBINAR GUIDE
  • Step 1 Register

    Register for the webinar by clicking on the link in the email invite. You'll receive a confirmation email with a unique link to join the session. Click "Add to calendar" to ensure you don't miss the webinar.

  • Step 2 Join

    At the time of the webinar, click the join link in the confirmation email or your calendar invite. Alernatively enter the 9-digit code into the box above. You can join from any Mac or Windows computer to join with our iOS or Android mobile apps.

  • Step 3 Watch & Learn

    If you arrive before the organizer, you'll see a window confirming that you successfully connected. Once the organizer arrives the Webinar will begin.

  • 09:00 - 09:50 SESSION 1