Project Stories | Support capacity checking for the fan plant structure

Written by MIDAS GEO TEAM | 2020.04.07

About Project

Two types of analysis were performed based on different 3D model files. The full underground structure was modeled to monitor the initial support capacity including rock bolts and shotcrete, at structural level. A construction sequences analysis of the fan plant was ran to obtain the general stability and settlements of the soil layers, at geotechnical level.

 

Rendering of a fan plant

 

Project Name

Trans Hudson Express Tunnel (THE Tunnel)

Location

New York, USA

Construction Period

2009 – 2010

Contractor

THE Partnership (Parsons Brinckerhoff/STV/DMJM Joint Venture)

Designer

Parsons Brinckerhoff

 

Project location

 

3D analysis model for fan plant with rock bolts and shotcrete