About Project

 

The teams of Soletanche Bachy and Vinci Construction France have performed a whole range of geotechnical work to build in Monaco a tower 170 m high, with 10 underground parking levels. This project, carried out on steeply sloping land, began with the execution of an asymmetric excavation 42 m high, to clear the land area for the tower and construct the tower foundations and the parking lot enclosure. This project, carried out to a very tight schedule, is subject to very severe geological, architectural and logistic constraints.

 

Construction site of Odeon Tower

Construction site

 

Project Name

Odeon Tower

Location

La Rousse/Saint Roman, Monaco

Construction Period

2009 – 2014

Contractor

Vinci Construction France

Designer

Coyne et Bellier

 

The great height of the tower, and the resulting actions on the foundation under the influence of wind and earthquake, require close liaison between the school and those of the tower of supports. It is difficult to allow the establishment of a single model sufficiently refined to account for the stresses in the structure and in the support given a constitutive law elastoplastic ground. Therefore, they built a geotechnical 3D finite element model, to account for the behavior of land and retaining walls.

 

Location and project dimensions

Location and project dimensions

 

Planned excavation and neighbouring foundations

Planned excavation and neighboring foundations

 

Cable anchor system and barrette foundations & basement slabs enclosed in diaphragm wall

Cable anchor system and barrette foundations & basement slabs enclosed in diaphragm wall

 

Contour plot of horizontal displacements after completion of construction

Contour plot of horizontal displacements after completion of construction

 

 

btn_trial

 

 

 


 

👇 Watch the popular case study webinar

How to quickly master the geotechnical design report

Topics Deep excavation MIDAS GTS NX

MIDAS GEO TEAM

Written by MIDAS GEO TEAM

Want Engineering tips
& Tech-trends in your inbox?